Modular house factory with Lidamodularhouse: Foundation Requirements – Flat-packed container house: The foundation requirements are simpler, enabling the use of strip foundations or pier foundations. In some cases, these houses can be placed directly on the ground without any foundation, eliminating the need for extensive leveling of the indoor ground. Light steel movable plank building: The foundation process is complicated, involving pouring concrete foundations measuring 300 mm x 300 mm. The house is connected to the foundation using expansion bolts, and the ground of the first floor needs to be leveled with concrete. After the house is moved, the foundation cannot be reused. Find more info on prefab houses China.
Lida folding container house (foldable container house) is designed to meet the quick installation purpose in some emergency projects. One unit of folding container house can be installed within 3 minutes by 2 workers. It is widely used as Site office, Disaster relief materials reserve, emergency shelter house, site living room, meeting room, dormitory, shop, toilet, storage, kitchen, shower room and so on. Light material without overload, easy to pack and transport. Lida folding container house (foldable container house)can be assembled and disassembled more than 10 times, and the service life is more than 15 years.
Lida Integrated Camps are widely used in General Contracting projects, Oil and gas field projects, Hydroelectric Projects, Military projects, mining sectors projects, and so on, which are intended for short- and long-term site mobilization. Lida Construction Site Labor Camp are designed to deliver the most appropriate and economical solution in terms of prefabricated house buildings, container house building or both of production system in line, which need to take the time, cost, site location, client requirements, and government regulations into consideration.
Lida Construction Site Labor Camp building is made of light steel as structure and sandwich panels for wall and roof. Insulation of sandwich panel can be polystyrene, polyurethane, rock wool and fiber glass, which is determined by the demand and environment requirements. Lida Construction Site Labor Camp buildings can be assembled several times after one site construction finished, installed easily and cost effective.
The Lida Group Integrated Campsite Warehouse is an important part of the integrated camp. The camp warehouse is usually a separate building used to store all kinds of materials in the camp operation process. The size of the warehouse is individually tailored to the future operational needs of the camp contractor. The Lida Group’s comprehensive camp laundry room adopts a light steel structure skeleton and is maintained by composite plates or color steel. According to the requirements of the camp and the local environment, the composite panels are available in EPS, fiberglass, rock wool and PU panels. Read additional details on https://www.lidamodularhouse.com/.
The design concept of Lida greenhouse is “adhere to the principle of science and practicality; adhere to the principle of improving the utilization rate of land resources, energy saving, water saving and high efficiency; adhere to the principle of advanced, reliable and appropriate selection of greenhouse structural materials and equipment; adhere to the principle of world leading”. Lida greenhouse mainly includes greenhouse foundation, main structure, covering materials, ventilation system, internal sunshade system, fan wet curtain cooling system, power distribution and electric control system, etc. The greenhouse designed by our company adopts hot galvanized light steel structure, which has strong anti snow ability and long service life, and is committed to building excellent greenhouse projects for customers.
Lida Group is one of the most modular house manufacturers in China. That we has become member of several associations such as China Steel Structure Association, China Council for the Promotion of International Trade and China Building Metal Structure Association etc. In 2017, Lida Group was awarded the Demonstration Base of Assembly Building in Shandong Province. In the reconstruction of Sichuan after 5.12 Earthquake, Lida Group was praised as an advanced enterprise because of its outstanding contribution.